Magnet.me - Het slimme netwerk waar studenten en professionals hun stage of baan vinden.
Het slimme netwerk waar studenten en professionals hun stage of baan vinden.
Je carrière begint op Magnet.me
Maak een profiel aan en ontvang slimme aanbevelingen op basis van je gelikete vacatures.
This is a temporary role running through the end of the year — with a good chance of extension until the end of March 2026
What will you do?
As an on-site manager, you will oversee and coordinate the execution of works at the SIF yard (Maasvlakte, Port of Rotterdam). This includes the installation of sensors, internal and external piping, and the forerunner on three monopiles. You will act as the primary point of contact between GBM Works, SIF, and all subcontractors during on-site execution.
There is a possibility that you may also be asked to manage a second site for the execution of a follow-up pump test.
Your role includes:
GBM Works’ Story:
While working as an intern for an offshore contractor that builds offshore wind farms, a young engineer discovered that their ships and installation methods were far from sustainable. Marine life suffers from humanity’s efforts to replace fossil fuels with renewable sources, yet the infrastructure and techniques used for installation are still light years behind. Determined to change this, he set out to design his own solution.
That’s how, more than 7 years ago, Ben Arntz founded GBM Works and developed a disruptive and innovative method to silently install offshore foundations. Today, we are advancing our Vibrojet® tool for the next generation of XXL monopiles used in offshore wind energy. Our patented method addresses major challenges in the offshore wind industry, including harmful noise to marine life, potential delays, fatigue damage to piles, and scaling issues associated with current 'piling' methods.
Workplace
Our flexible workplace is located at the Maasvlakte, Rotterdam.
What do we offer?
We are a dynamic team of 25 professionals, united by diverse experiences, cultural backgrounds, and perspectives. More importantly, we foster an inspiring environment filled with highly motivated individuals who are driven to achieve ambitious goals.
About you
Recruitment agencies - no thank you!
GBM Works was founded in 2016 with the mission to develop a radically new installation method for offshore foundation piles, made possible with our invention: the Vibro-drill. We have since won several important innovation awards with our plans and progress and we are collaborating with the most important offshore contractors in Europe to bring our invention to market as soon…
GBM Works was founded in 2016 with the mission to develop a radically new installation method for offshore foundation piles, made possible with our invention: the Vibro-drill. We have since won several important innovation awards with our plans and progress and we are collaborating with the most important offshore contractors in Europe to bring our invention to market as soon as possible.
Right now, we are designing, fabricating and testing prototypes of our invention, we could use your help to finish them!
Resources:
Change language to: English
Deze pagina is geoptimaliseerd voor mensen uit Nederland. Bekijk de versie geoptimaliseerd voor mensen uit het Verenigd Koninkrijk.